At the end of today’s sound system meeting, our committee chair and consultants wanted a closer look at the church ceiling. I tagged along.

STA ceiling

Scaffolding has been up for weeks. First to facilitate asbestos removal. Now the ceiling is stripped down to the beams.

STA ceiling 2

It’s surreal to be walking just six feet under your church’s ceiling. The sun was just setting, and way up near the top, there was a lot of light coming through those upper windows. Lots of plywood. Stacks of drywall. Strange light. Another two months in exile.