At the end of today’s sound system meeting, our committee chair and consultants wanted a closer look at the church ceiling. I tagged along.
Scaffolding has been up for weeks. First to facilitate asbestos removal. Now the ceiling is stripped down to the beams.
It’s surreal to be walking just six feet under your church’s ceiling. The sun was just setting, and way up near the top, there was a lot of light coming through those upper windows. Lots of plywood. Stacks of drywall. Strange light. Another two months in exile.

