Up

At the end of today’s sound system meeting, our committee chair and consultants wanted a closer look at the church ceiling. I tagged along.

STA ceiling

Scaffolding has been up for weeks. First to facilitate asbestos removal. Now the ceiling is stripped down to the beams.

STA ceiling 2

It’s surreal to be walking just six feet under your church’s ceiling. The sun was just setting, and way up near the top, there was a lot of light coming through those upper windows. Lots of plywood. Stacks of drywall. Strange light. Another two months in exile.

About catholicsensibility

Todd lives in the Pacific Northwest, serving a Catholic parish as a lay minister.
This entry was posted in Parish Life. Bookmark the permalink.

One Response to Up

  1. Susannah says:

    Fabulous, what a blog it is! This web site provides valuable
    data to us, keep it up.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s